DRILLING + ANCHORING TECHNOLOGY WITH A BIG PLUS!
BIS-PE GEN3 Pure Epoxy 585 ml
€ 64,30 excl. VAT
Pure-Epoxy Injection Adhesive with ETA Option 1 Assessment for EXTREME Loads
- For the use with Hammer, Diamond and Hollow Drill Bits
- No Cleaning required for Hollow Drill Bits
- 100 Year Design Life!
- For Dry, Wet and Flooded Drill holes
- NEW! ETA for post-installed rebar according to TR069
- Suited for the Installation of Threaded Rods, Rebar and Anchor Sleeves in Cracked and Non-Cracked Concrete
- C1 and C2 Seismic Assessment
- Significantly Higher Loads, certainly at higher temperatures
- Slow Curing, Ideal for Rebar Doweling at greater embedment depths
- Low VOC: A+ Rating
- Fire Test Report
- LEED Certificate
In stock
Need a larger quantity or working on a bigger project? request a quote.
INSTALLATION PROCEDURES
Hammer drilling

Hole drilling

Diamond drilling

Installation Dimensions
For Installation Dimensions and Loads please refer to the Technical Data Sheets (TDS) or European Technical Assessment (ETA) under Downloads.
Curing times
The temperature pattern must be between +5°C and +40°C.
| Concrete temperature ˚C | Processing time | Dry drillholes | Wet drillholes |
| 0 to +4 | 90 min | 144 hrs | 288 hrs |
| +5 to +9 | 80 min | 48 hrs | 96 hrs |
| +10 to +14 | 60 min | 28 hrs | 56 hrs |
| +15 to +19 | 40 min | 6 hrs | 36 hrs |
| +20 to +24 | 30 min | 12 hrs | 24 hrs |
| +25 to +34 | 12 min | 9 hrs | 6 hrs |
| +35 to +39 | 8 min | 6 hrs | 12 hrs |
| +40 | 8 min | 4 hrs | 8 hrs |
| Weight | 1,000000 kg |
|---|



