DRILLING + ANCHORING TECHNOLOGY WITH A BIG PLUS!
BIS-PE GEN3 Pure Epoxy 585 ml
Original price was: € 64,30.€ 23,15Current price is: € 23,15. excl. VAT
Offer valid until 31 October 2026
Injection mortar with ETA Option 1
In stock
Need a larger quantity or working on a bigger project? request a quote.
INSTALLATION PROCEDURES
Hammer drilling

Hole drilling

Diamond drilling

Installation Dimensions
For Installation Dimensions and Loads please refer to the Technical Data Sheets (TDS) or European Technical Assessment (ETA) under Downloads.
Curing times
The temperature pattern must be between +5°C and +40°C.
| Concrete temperature ˚C | Processing time | Dry Drill holes | Wet Drill holes |
| 0 to +4 | 90 min | 144 hrs | 288 hrs |
| +5 to +9 | 80 min | 48 hrs | 96 hrs |
| +10 to +14 | 60 min | 28 hrs | 56 hrs |
| +15 to +19 | 40 min | 18 hrs | 36 hrs |
| +20 to +24 | 30 min | 12 hrs | 24 hrs |
| +25 to +34 | 12 min | 9 hrs | 18 hrs |
| +35 to +39 | 8 min | 6 hrs | 12 hrs |
| +40 | 8 min | 4 hrs | 8 hrs |