BIS-HY GEN2 Hybrid 420 ml

 46,00 excl. VAT

Injection mortar ETA Option 1 for cracked concrete

In stock

Calculate required quantity

Need a larger quantity or working on a bigger project? request a quote.

Secure payment via

Installation Procedures

Hammer drilling

Hole drilling

Installation Dimensions

For Installation Dimensions and Loads please refer to the Technical Data Sheets (TDS) or European Technical Assessment (ETA) under Downloads.

Curing times

Cartridge temperature should be between +5˚C and +40˚C.

Concrete temperature ˚CProcessing timeDry Drill holesWet Drill holes
-5 to -150 min5 hrs10 hrs
0 to +425 min3.5 hrs7 hrs
+5 to +915 min2 hrs4 hrs
+10 to +1410 min1 hrs2 hrs
+15 to +196 min40 min80 min
+20 to +293 min30 min60 min
+30 to +402 min30 min60 min