VDP Quartz M10
VDP Quartz M10
VD-Quartz is a spin type, Vinylester based, glass capsule anchor with ETA Assessment, option 1 for cracked and non-cracked concrete
Features
- Increased Load Bearing Capacity
- Simplified Cleaning Procedures
- Easy Installation
- Fast Curing
- Available in 1,5t Capsules
- F120 Fire Rating
- VOC Rating: A+
- Zero Chemical or Plastic Wastage
- B+BTEC DesignFix® Support
Part Nr. 3900310V
EAN: 8714345149523
Qty./Box: 10
Installation Procedures
Product Dimensions
Anchor Size |
Da |
[mm] |
M10 |
Anchor Rod Length |
La≥ |
[mm] |
130 |
Capsule Type |
VDP |
|
M10 |
Capsule Diameter |
Dp |
[mm] |
11 |
Capsule Length |
Lp |
[mm] |
80 |
Capsule Volume |
Vp |
[cc] |
5,7 |
Required Volume/cm |
Vs |
[cc/cm] |
0,59 |
Steel Brush Diameter |
D |
[mm] |
13 |
Min. Brush Diameter |
Dmin |
[mm] |
11,5 |
Installation Dimensions
Anchor Size |
Da |
[mm] |
M10 |
Hole Diameter |
d0 |
[mm] |
12 |
Embedment Depth |
h0=hef |
[mm] |
90 |
Diameter Fixture Hole |
df |
[mm] |
12 |
Fixture Height |
tfix≤ |
[mm] |
23 |
Recommended Torque |
Tinst |
[Nm] |
20 |
Member Thickness, Edge Distance & Spacing
Anchor Size |
Da |
[mm] |
M10 |
Min. Member Thickness |
hmin |
[mm] |
120 |
Min. Edge Distance |
Cmin |
[mm] |
45 |
Min. Spacing |
Smin |
[mm] |
45 |
Curing Times
Concrete Temperature |
Min. Curing Time in Dry Holes |
Min. Curing Time in Wet Holes |
≥ -5˚C |
5 hrs |
10 hrs |
≥ +5˚C |
1 hr |
2 hrs |
≥ +20˚C |
20 min |
40 min |
≥ +30˚C |
10 min |
20 min |