BIS-V Vinylester 300 ml

 30,20 excl. VAT

Injection mortar ETA Option 1 for cracked concrete

In stock

Calculate required quantity

Need a larger quantity or working on a bigger project? request a quote.

Secure payment via

Installation Procedures

Installation Dimensions

For Installation Dimensions and Loads please refer to the Technical Data Sheets (TDS) or European Technical Assessment (ETA) under Downloads.

Curing times

Cartridge Temperature should be min. +15˚C. For damp bore holes the curing time should be doubled.

Concrete temperature ˚CProcessing timeDry Drill holes
≥ -1090 min24 hrs
≥ -590 min14 hrs
≥ 045 min7 hrs
≥ +525 min2 hrs
≥ +1015 min80 min
≥ +206 min45 min
≥ +304 min25 min
 ≥ +352 min20 min
≥ +401.5 min15 min