YOU ARE AT THE INTERNATIONAL WEBSITE, SWITCH TO: | NETHERLANDS | USA |  
   
 
 
 
Bridge Railing
Gramsbergen (NL)

Two bridges in Gramsbergen (NL) were closed off
in april 2018 due to safety concerns.

Inspections showed the bridges from 1958
no longer were suited for motorised traffic.

 

Work on the replacement of both bridges started monday march, 4 and is expected to be completed by the end of september.

M24 anchors were selected for the fastening of the bridge railings, installed in diamond drilled holes using BIS-PE Pure-Epoxy Injection Adhesive.

Related:

 
 

Project Data:

  • Anchor Dimensions: M24 X 330 mm
  • Bore Hole Diameter: 28 mm
  • Embedment Depth: 250 mm
  • Steel Quality: Steel 8.8 Hot Dip Galvanized
  • Drilling Method: Diamond
  • Adhesive: BIS-PE Pure-Epoxy 3:1
  • Number of Anchors: 454
  • Realisation: september 2019.
 
   
   
   
 

Logo B+BTec

   
Contact General Products
Munterij 8 Privacy & Cookie Statement Core Drilling
4762 AH Zevenbergen On-Site with B+BTec Structural Anchoring
  Website B+BTec Netherlands Concrete Cutting
The Netherlands Website B+BTec USA Hammer Drilling
    Tile & Stone
T +31 168 331 260    
F +31 168 331 280   Folow us on:
E info@bbtectools.com
   
© Copyright 2010-2020 B+BTec. All Rights Reserved. B+BTec, Karat & Diamond3 are Registered Trademarks.