YOU ARE AT THE INTERNATIONAL WEBSITE, SWITCH TO: | NETHERLANDS | USA |  
   
 
 
 
Wire Saw Central Station
Amsterdam, (NL)

In preparation of the construction of the stairway
leading into the center of the Amsterdam Central
Station Main Hall, a large 8 x 3 mtr opening was
cut in the wall of metro hub below with
surgical precision.


 

Not an easy job, considering no heavy equipment could be used at said location and the work had to be done virtually noise and vibration free.

It was decided to create the opening by cutting away multiple concrete blocks using the B+BTec CS17-E Wire Cutting System.

Realisation: november 2019.

Related:

 
 

Project Data:

  • Wire Cutting System: B+BTec CS17-E
  • Dimensions Opening: 8 x 3 x 1.7 mtr
  • Dimensions Concrete Blocks: 1 x 1 x 1.7 mtr
  • Number of Blocks: 24
  • Weight per Block: ± 4000 kg
 
   
 

Logo B+BTec

   
Contact General Products
Munterij 8 Privacy & Cookie Statement Core Drilling
4762 AH Zevenbergen On-Site with B+BTec Structural Anchoring
  Website B+BTec Netherlands Concrete Cutting
The Netherlands Website B+BTec USA Hammer Drilling
    Tile & Stone
T +31 168 331 260    
F +31 168 331 280   Folow us on:
E info@bbtectools.com
   
© Copyright 2010-2020 B+BTec. All Rights Reserved. B+BTec, Karat & Diamond3 are Registered Trademarks.