{"id":1117,"date":"2025-11-25T16:22:15","date_gmt":"2025-11-25T15:22:15","guid":{"rendered":"https:\/\/bbtectools.com\/p\/bis-v-vinylester-300-ml\/"},"modified":"2026-07-09T17:00:55","modified_gmt":"2026-07-09T15:00:55","slug":"bis-v-vinylester-300-ml","status":"publish","type":"product","link":"https:\/\/bbtectools.com\/en\/p\/bis-v-vinylester-300-ml\/","title":{"rendered":"BIS-V Vinylester 300 ml"},"content":{"rendered":"<h3 class=\"wp-block-heading\">Installation Procedures<\/h3>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/bbtectools.com\/wp-content\/uploads\/2025\/11\/BIS_V_INSTALL_HD.png\" alt=\"\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Installation Dimensions<\/h3>\n\n\n\n<p>For Installation Dimensions and Loads please refer to the Technical Data Sheets (TDS) or European Technical Assessment (ETA) under Downloads.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Curing times<\/h3>\n\n\n\n<p>Cartridge Temperature should be min. +15\u02daC. For damp bore holes the curing time should be doubled.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td class=\"has-text-align-right\" data-align=\"right\"><strong>Concrete temperature \u02daC<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\"><strong>Processing time<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\"><strong>Dry Drill holes<\/strong><\/td><\/tr><tr><td class=\"has-text-align-right\" data-align=\"right\">\u2265 -10<\/td><td class=\"has-text-align-right\" data-align=\"right\">90 min<\/td><td class=\"has-text-align-right\" data-align=\"right\">24 hrs<\/td><\/tr><tr><td class=\"has-text-align-right\" data-align=\"right\">\u2265 -5<\/td><td class=\"has-text-align-right\" data-align=\"right\">90 min<\/td><td class=\"has-text-align-right\" data-align=\"right\">14 hrs<\/td><\/tr><tr><td class=\"has-text-align-right\" data-align=\"right\">\u2265 0<\/td><td class=\"has-text-align-right\" data-align=\"right\">45 min<\/td><td class=\"has-text-align-right\" data-align=\"right\">7 hrs<\/td><\/tr><tr><td class=\"has-text-align-right\" data-align=\"right\">\u2265 +5<\/td><td class=\"has-text-align-right\" data-align=\"right\">25 min<\/td><td class=\"has-text-align-right\" data-align=\"right\">2 hrs<\/td><\/tr><tr><td class=\"has-text-align-right\" data-align=\"right\">\u2265 +10<\/td><td class=\"has-text-align-right\" data-align=\"right\">15 min<\/td><td class=\"has-text-align-right\" data-align=\"right\">80 min<\/td><\/tr><tr><td class=\"has-text-align-right\" data-align=\"right\">\u2265 +20<\/td><td class=\"has-text-align-right\" data-align=\"right\">6 min<\/td><td class=\"has-text-align-right\" data-align=\"right\">45 min<\/td><\/tr><tr><td class=\"has-text-align-right\" data-align=\"right\">\u2265 +30<\/td><td class=\"has-text-align-right\" data-align=\"right\">4 min<\/td><td class=\"has-text-align-right\" data-align=\"right\">25 min<\/td><\/tr><tr><td class=\"has-text-align-right\" data-align=\"right\">&nbsp;\u2265 +35<\/td><td class=\"has-text-align-right\" data-align=\"right\">2 min<\/td><td class=\"has-text-align-right\" data-align=\"right\">20 min<\/td><\/tr><tr><td class=\"has-text-align-right\" data-align=\"right\">\u2265 +40<\/td><td class=\"has-text-align-right\" data-align=\"right\">1.5 min<\/td><td class=\"has-text-align-right\" data-align=\"right\">15 min<\/td><\/tr><\/tbody><\/table><\/figure>","protected":false},"excerpt":{"rendered":"<p><span class=\"condensed\">ETA option 1 approved, fast curing, styrene-free, Vinylester injection mortar for\u00a0<\/span><span class=\"vet\">HEAVY LOADS<\/span><span class=\"condensed\">. Suitable for threaded rods and rebar in Cracked and Uncracked Concrete.<\/span><\/p>\n<ul>\n<li class=\"translation-block\">ETA Assessed for Threaded Rods M8 - M30 and Rebar Dowels \u00d88 - 32 mm<\/li>\n<li>ETA Approved for Post Installed Rebar \u00d88 - 25 mm<\/li>\n<li><span class=\"vet\">Impact tested for the installation of Safety Barrier Glazing and Glass Railings acc. to DIN 18008-4, Cat. A. new<\/span><\/li>\n<li>For Cracked and Uncracked Concrete<\/li>\n<li>For Dry, Wet &amp; Flooded Holes<\/li>\n<li>Fire Rated F120<\/li>\n<li>Seismic Approval C1<\/li>\n<li>VOC Report A+<\/li>\n<li>Lead Tested<\/li>\n<li>Drinking Water Certificate<\/li>\n<li>Styrene Free<\/li>\n<li>B+BTEC DesignFix\u00ae Support<\/li>\n<\/ul>","protected":false},"featured_media":1118,"template":"","meta":{"_acf_changed":false},"product_brand":[],"product_cat":[77,70,71,79],"product_tag":[],"class_list":{"0":"post-1117","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-injectiemortels","7":"product_cat-bevestigen","8":"product_cat-chemische-ankers","9":"product_cat-lijmankers","10":"product_shipping_class-voorraad","12":"first","13":"instock","14":"taxable","15":"shipping-taxable","16":"purchasable","17":"product-type-simple"},"acf":[],"_links":{"self":[{"href":"https:\/\/bbtectools.com\/en\/wp-json\/wp\/v2\/product\/1117","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bbtectools.com\/en\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/bbtectools.com\/en\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bbtectools.com\/en\/wp-json\/wp\/v2\/media\/1118"}],"wp:attachment":[{"href":"https:\/\/bbtectools.com\/en\/wp-json\/wp\/v2\/media?parent=1117"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/bbtectools.com\/en\/wp-json\/wp\/v2\/product_brand?post=1117"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/bbtectools.com\/en\/wp-json\/wp\/v2\/product_cat?post=1117"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/bbtectools.com\/en\/wp-json\/wp\/v2\/product_tag?post=1117"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}