Tram Rails Amsterdam (NL)
On and around the new "station island" in front of the Amsterdam Central Station new modern tramstops including new tracks, masts and overhead power lines are constructed. Work started in 2019.
For the installation of the tram rail tracks GVB glass capsule anchors, a special VDP anchor, were used. B+BTec also supplied the anchor studs and HiSpeed Diamond Core Bits
Realisation
October 2019
Related



Project Data
- Anchor Dimension: M24
- Bore Hole Diameter: 28 mm
- Embedment Depth: 140 mm
- Steel Quality: 5.8
- Drilling Method: Diamond
- Base Material: Concrete C20/30
- Anchor Type: VDP Glass Capsule Anchor
- M21 x 110 mm (Special Capsule)