Bridge Railing Gramsbergen (NL)
Two bridges in Gramsbergen (NL) were closed off in april 2018 due to safety concerns.
The project
Inspections showed the bridges from 1958 no longer were suited for motorised traffic. Work on the replacement of both bridges started monday march, 4 and is expected to be completed by the end of september. M24 anchors were selected for the fastening of the bridge railings, installed in diamond drilled holes using BIS-PE Pure-Epoxy Injection Adhesive.
Realisation
September 2019
Related
Anchor calculation BIS-PE Pure Epoxy HiSpeed Core Bits



Project Data
- Anchor Dimensions: M24 X 330 mm
- Bore Hole Diameter: 28 mm
- Embedment Depth: 250 mm
- Steel Quality: Steel 8.8 Hot Dip Galvanized
- Drilling Method: Diamond
- Adhesive: BIS-PE Pure-Epoxy 3:1
- Number of Anchors: 454
- Realisation: september 2019.