Bridge Railing Gramsbergen (NL)

Two bridges in Gramsbergen (NL) were closed off in april 2018 due to safety concerns.

The project

Inspections showed the bridges from 1958 no longer were suited for motorised traffic. Work on the replacement of both bridges started monday march, 4 and is expected to be completed by the end of september. M24 anchors were selected for the fastening of the bridge railings, installed in diamond drilled holes using BIS-PE Pure-Epoxy Injection Adhesive.

Realisation

September 2019

Related

Anchor calculation     BIS-PE Pure Epoxy    HiSpeed Core Bits

Bridge Railing Gramsbergen (NL)
Bridge Railing Gramsbergen (NL)
Bridge Railing Gramsbergen (NL)

Project Data

  • Anchor Dimensions: M24 X 330 mm
  • Bore Hole Diameter: 28 mm
  • Embedment Depth: 250 mm
  • Steel Quality: Steel 8.8 Hot Dip Galvanized
  • Drilling Method: Diamond
  • Adhesive: BIS-PE Pure-Epoxy 3:1
  • Number of Anchors: 454
  • Realisation: september 2019.

Meet our experts

Get a non-binding advice from our experts to find a suitable solution.

Arie Kranendonk
Arie KranendonkSales Manager
    Meet the expert

    Our customers
    Our solutions
    Our certificates